Basic inspection: Firstly, the sundries on the foundation should be removed, and a temporary and reliable fence should be erected on the edge; level gauges for measuring elevation, Ф0.5mm steel wire, wire hammer, CK61100 CK61125 MULTI-FUNCTIONAL AND PRECISION METAL CNC FLAT-BED LATHEink fountain and adjustable brackets for pulling steel wire ropes should be prepared; foundation center given by civil engineering line position, check whether the vertical and horizontal centerlines are vertical.H32I FLAT BED CNC LATHE After the center line meets the requirements, use a hammer to cast the center position on the foundation embedded part or the foundation edge angle iron frame, and mark it; Vacuum heat treatment of slender hollow parts according to the foundation center line, check the actual position and center deviation of the anchor bolts and each positioning embedded part No more than 2mm, record the inspection results in the installation record; Vacuum quenching of KMN steel structure
top of page
bottom of page
ty